|
| We have several smaller bins with 6" loadouts that we rent. Takes just a little under 45 minutes to load 950 bu but we did put a larger dia pulley on the unload motor.. WE have done the grain cart route as well. I can usually have the cart loaded by the time IHboog gets back from the processor if there isn't much of a line. Takes around 20 minutes to load from the bins with 8" unloads and 10 minutes with a 10" unload. | |
|