|
| Got a few questions here on surface and the operation of field level II. I'm fairly new to landforming/dirt moving. We're flat here 0% grade, and I've an 80 acre farm that's been tiled and I have closed the surface ditches and now want to make everything flat and level with no slope or grade. The question is, after my survey how do I find my ideal target height/elevation to work toward? I'm wondering how to do this on the FM-1000, or on surface? | |
|