|

| As long as you have fall below the level of the pool being siphoned distance shouldn't be a factor. Now if "below the pool" is a long distance from your dam it may be difficult to get started. The key is removal of ALL the air in line. Your height will be a challenge to start but should work. We siphoned on a 6 acre lake once that had a stopped up tube. Used 6" field tile for that project. It was a challenge primeing that thing. All tile is not perfect and a pin hole strategly placed can mess up the whole project. | |
|