|
Central South Dakota | Is the snow load different between the two buildings. I know that was some of the difference when we priced those buildings, the morton had a heavier snow load. We went with morton put a 60' x 120' x 18' up in 9 days dirt floor machine shed. Would have been done in 7 but the wind blew too hard to put roof tin on for two days. Even showed up on sunday to catch up because they lost a 2 days with the wind. The crew and their experience can really make or break these deals IMHO. | |
|