Posted 12/25/2010 02:31 (#1505706 - in reply to #1505417) Subject: Re: EPS Buildings ?
NW Washington
They usually increase pole building snow load rating by moving the trusses closer together and using shorter purlins for higher snow loads. Snow load requirement are usually set or recommended by local or state building codes.