|
 northwest missouri | Did my Farm King 13 x 70 @ about 1,700,000 last year. I went all over the tube tapping with a hammer to see if I could detect any thin spots before replacing flighting. Bought the FK replacement flight had a bank along one side of building that was level, raised lower end of auger with tractor loader so tube was about level with bank pulled old out and new in with skid loader. Cost was about 20% of new auger.. | |
|