North Central Illinois | Over the past 10 years I've put up two 3000 bushel government bins on an existing concrete pad, a 21' 5000 bushel bin, a 30' with stirator that holds just under 10k without completely burying the stirator and a 27' top dry that holds around 10k. I haven't set up controls for the burner or done any wiring on that one yet. All dirt work done myself and just some hired labor to help with construction. This is all used stuff that was bought for 30ยข per bu or less already taken down. All in I've spent close to $40k out of pocket. I had quoted new equivalent to my 30' on 2020 and it was right at $50k plus dirt work. | |
|