AgTalk Home
AgTalk Home
Search Forums | Classifieds | Skins | Language
You are logged in as a guest. ( logon | register )

"Hay in a Day" (or maybe two days)
View previous thread :: View next thread
   Forums List -> Stock TalkMessage format
 
Jim
Posted 7/8/2026 20:42 (#11695956 - in reply to #11695868)
Subject: RE: "Hay in a Day" (or maybe two days)


Driftless SW Wisconsin

How many stretchers/rolls of plastic are you using? I set the speed for about 6 wraps. With 30" rolls that means each wrap is about 5" behind the previous one. You can measure it when the cycle stops. For 8 layers the overlap is 30"/8"=3.75". Set the ring speed valve to give you the overlap for the number of wraps you want. I'm not familiar with the brand of wrap you mention. Could be a different thickness than mine?

If you are using all 4 rolls then rotation speed is really slow. Check your overlap.



Edited by Jim 7/8/2026 20:43
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)