AgTalk Home
AgTalk Home
Search Forums | Classifieds (10) | Skins | Language
You are logged in as a guest. ( logon | register )

Powering a grain facility upgrade
View previous thread :: View next thread
   Forums List -> Machinery TalkMessage format
 
Farms With CASE
Posted 6/27/2026 10:14 (#11685973)
Subject: Powering a grain facility upgrade



North Liberty and South Bend, Indiana
Expanding and upgrading. Looks like I'll have 5 auger motors and a dryer that will or could be 3ph. Dryer for sure is. I'd like to run the auger motors with speed control. If I did the math correctly I'd need a 150 horsepower phase converter. Question is how could I go about it. 1ph into phase converter then 3ph to vfd's for motors and 3ph to dryer. Or 1ph into converter for dryer and 1ph to 3ph vfd's for the motors. I have asked a few electricians and gotten different answers. Looking for real world advice. I believe the cheapest route is a phase converter with vfd's after it. None of these auger motors will run unless dryer is running. Fans and unloads are additional and can be run single phase although I may run unloads on 1ph to 3ph vfd's.
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)