Roseglen, North Dakota | With that many questions and never having done one that size you better have your ducks in a row.
Forms need to be stout.
If not staked run cable around outside.
Possibly fill against the forms.
If having air floor, power troll isn't necessary
Always put forms up before rebar.
12 to 18 inch wide footing 1 foot deep
Rings of rebar in the footing
Fill footing first with concrete
Have plenty of help
Have floor 18 to 24 inch above grade.
Shd take from 30-37 yards
Have over 15 of them but hired every one of them.
Concrete labor is the poorest place in the world to try and save money if youre a rookie. You only get 1 chance to do it right. | |
|