NE ND | Same with us generally, the biggest set back is truck wait time.
But assuming an 8 row hypothetically loads %25 quicker all other things being equal, that saves me 800 minutes of loading time (conservatively 2 minutes per truck) if I average 400 loads a year. That’s over 13 hours of actual digging time. That seems like a big deal to me, finishing one whole 12 hour shift earlier is a big deal some years. Maybe it’s not quit that simple as I’m making it tho. I
Edited by Nodak63 3/13/2026 09:15
| |
|