Near Intersection of I-35 & I-90 Southern Mn. | We haven't gotten to the Boundary and AB lines yet, We need to clean house in that area also. I don't use SMS so I'm doing this all with the displays, USB sticks and my fingers at this point.
My plan was to move the "good" AB lines to the new field names from where they will be used. In our operation it will be either just my Great Nephew or I (mostly him of late) that will be involved so having multiple operators is less of a problem for us.
I created a new Grower called "Thisius Revised 2026", I planned on leaving the majority of the "old stuff" where it is under the old Grower which had a different name and move the AB lines that are still useful to the new Grower.
Since we haven't changed equipment, the various configurations should be fine.
Edited by tedbear 2/6/2026 09:41
|