|
N.E. MO | Doing a complete rebuild on one of the excavator buckets. Pretty big job with what I have to work with. Got it mostly cut apart the last few days. Lots of prep work to do still, while waiting on a local place to bend the new floor out of 5/8” AR-400. Then a little bit of welding to do. Have another bucket to do when this one is ready to take its place. Job security for a while.
(IMG_8569 (full).jpeg)
(IMG_8573 (full).jpeg)
(IMG_8575 (full).jpeg)
(IMG_8577 (full).jpeg)
(IMG_8603 (full).jpeg)
(IMG_8606 (full).jpeg)
(IMG_8607 (full).jpeg)
(IMG_8609 (full).jpeg)
(IMG_8610 (full).jpeg)
(IMG_8613 (full).jpeg)
Attachments ----------------
IMG_8569 (full).jpeg (192KB - 20 downloads)
IMG_8573 (full).jpeg (174KB - 19 downloads)
IMG_8575 (full).jpeg (191KB - 18 downloads)
IMG_8577 (full).jpeg (130KB - 17 downloads)
IMG_8603 (full).jpeg (245KB - 16 downloads)
IMG_8606 (full).jpeg (146KB - 15 downloads)
IMG_8607 (full).jpeg (155KB - 14 downloads)
IMG_8609 (full).jpeg (220KB - 13 downloads)
IMG_8610 (full).jpeg (165KB - 12 downloads)
IMG_8613 (full).jpeg (154KB - 11 downloads)
| |
|