Posted 12/5/2025 09:42 (#11458038 - in reply to #11457563) Subject: RE: New-tech nuclear power facility breaks ground next week.
With a life span of two to seven years, how could it be cost effective. Can’t shove a 30 inch diameter casing down a 30 inch diameter borehole. Going to take a massive rig to handle that. It can be done but could easily turn into another one of those projects that sucks a lot of money into promoters pockets and does little else.