 NEND | Thanks for posting the pictures. Now that I worked with it again, I see it does change with the track spacing. I think my operator had shifted the track quite a bit and it didn’t look right because of that. I take all the bad things I said about it I still wish they could be managed in Op Center though. I like sending a Work Plan out with the guidance lines I want to be used. I have created several Tillage lines for each field (Till 85°, Till 87°, etc.) When I’m saving things in the Work Plan, I select the angle I want tillage to be done at. A track set is automatically created in the display. Without the ability to send the Boundary Fill track, the operator has to add it to the Track Set. Not a huge deal, but if the goal is making life easy/efficient for the operator, it would be nice to include it in the Work Plan
Edited by bmatteson 11/16/2025 20:23
|