|
Ohio | The way I believe it will work which i cold be wrong. If you start at 38" it will run at your min slope until it achieves your target depth depending on how the lay of the land works and where you min max are set. You can see the target install line on the screen to get an idea will be the green line. Another way to do it which I have done in the past is set in the hole and use grade or pitch control I can't remember which one at the moment and set it to run .1 until you achieve the depth you want them switch it over to auto tile and finish it out. | |
|