| only the 2nd day trying to use Intellislope with Johnson Tile Plow.
Trying to lay a main going up a 0.4% slope.
settings at min grade 0.1% , min depth 36", max dept 60", target depth 48"
I am starting in a valley in a 38" starter hole,
I hoped the plow would run at 0.1% until it got to the target depth of 48" as I plowed up the slope.
but it does not, it just stays at about 38" until alomost to the top of the hill.
Am I wrong in my expectation? | |
|