NE MO | For that size machine, 1.5 yd heaped would be a load fully extended, but I highly doubt you’ll get that on a 36” wide bucket. 3 yd without a thumb, digging inline with tracks, loose material, possibly. Not a chance you’ll work over the track or load a truck. That machine isn’t nearly big enough to be efficient with anything larger than 1.5 yd bucket. And, I wouldn’t want to drop the thumb just because. Especially since the only thumb that’s nagtalk approved is a main pin, progressive link hydraulic setup. | |
|