SD, US | So I have some existing concrete that used to be a feeding floor for pigs with a smaller monoslope building next to it. I would like to put it to use for calving and having a smaller group of calves on it when backgrounding. It is roughly 80x60 for the concrete area.
The only place to put bunks is along the 80ft side, but the concrete slopes that direction. I’m thinking it would be okay if scrapped often, but looking for thoughts. Not a big fan of the slope going to the bunks, but that is the only option in this spot that I can tell. Let me know your thoughts, thanks! | |
|