|
| you will need a switchbox. There is an unlock for doing multiple products if you need that, aside from that it would just be getting the correct cabling. It will be a nice upgrade and get one of those displays out of the cab.
There is also a cable you can purchase where the incommand will control rate through the 440, but you would still need the 440 in that scenario. If you're making the change, I'd recomend doing it right and removing the 440 completely. The cabling will just run to your valves and flow meter | |
|