Stayner, Ontario | Sight #3 is your best choice since you have natural gas and 3 phase electric.
set the bins back from the roadway allowing tractor trailer space to unload and load .Leave lots of space for future bins.
design layout that trucks drive straight in , unload and do a 180 to go back out.
Set bins up so you can use a leg with a drive over pit to fill bins with and the leg to fill an overhead when unloading the bins.
Yields will keep getting higher. Top dry continuous is a good way to set up for drying.
A TRUCK scale is a key piece of equipment when setting up your elevator. We have three 5400 bu overhead bins over a 10ft x100 ft 100 tonne truck scale
which makes it very nice for loading trucks .
Go with at least a 5000 bu leg and 10" down pipes. GO WITH THE LARGEST YOU CAN AFFFORD.
Three phase hydro uses smaller gauge wire than single phase.
Edited by dunlogon 5/14/2025 14:38
| |
|