Posted 5/12/2025 11:39 (#11222092 - in reply to #11219395) Subject: RE: Kinze ISOBUS shutoff only configuration help
IA
You are unable to run it that way. Seed flow needs to happen and be run through the PMM. With no seed flow the deere display wont map and therefore no map no section control. Basically you have to run the seed monitoring through the same system.