Posted 5/7/2025 11:08 (#11216769 - in reply to #11216662) Subject: RE: John Deere Ops Center
Not wrong - no way to fix it currently if the wrong operation is selected on the display. One option would be to, on mobile, go to All Work, and hit the plus button to add a manual layer. This will make you a basic flat rate map that will at least have the right operation type & product, but wouldn't include anything like variable rate etc.