| mafrif - 4/10/2025 22:16
Julian- 2 questions
When using work.plan, what if you plan on using seed A, but when starting the field you carried over some of seed B, can you change that without issues? Does it automatically change hybrid?
I'm trying to setup an Rx to apply a product in furrow through my injection system, but that requires the carrier to also turn on and off, is it possible for an Rx to shut on and off two liquid products? Or will two matching Rx be made with a rate for each?
Thanks
When entering a field the system should propose to either stick to the current variety (as per the work setup) or switch to any of the planned varieties.
My recommendation would be to add all potential varieties to the work plan with the appropriate flat rate or prescription. (click "Select additional variety")
That allows the operator to pick the right variety and rate.
The ability to control the rate for two liquid products with an Rx depends on the operations visible in the work setup on your display.
If both tanks are shown as individual operations you can assign two Rx - one for each product. (you can as well plan those products and Rx ahead of time with work planner) |