|
Southeast Washington | We need multi swath because with changing directions on fields slopes there isn't enough power made to pull the hills.
Here is a few days ago as I got into the hills. Imagine being a sprayer and trying to guess what line to lock onto. At least with the drill i know where my edge is. Unfortunately it draws three lines for each swath and never erases the extra 2 after a pass. They are extended about 100 yards after lifting and tripping off. Annoying when turning for a plug or heading in to fill. Also it don't need to know it is going to be a sharp turn for every 90 degree corner or sharper. I don't have to for an A-B line so why for a free form line. I have to manually clear it to see where to get on the line. Very dangerous on a hillside. A-B lines are great and I enjoyed on the flats. Now I'm in the hills and in no way it's the latest version working. Total chaos is the best I can describe it.
(20250406_095744 (full).jpg)
(20250406_101747 (full).jpg)
(20250406_104715 (full).jpg)
(20250406_112201 (full).jpg)
Attachments ----------------
20250406_095744 (full).jpg (166KB - 8 downloads)
20250406_101747 (full).jpg (148KB - 5 downloads)
20250406_104715 (full).jpg (130KB - 4 downloads)
20250406_112201 (full).jpg (108KB - 5 downloads)
| |
|