|
| It was a CO Building made in Utah. https://cobuildings.com/ Only problem was the salesman I bought from a dealer of their buildings messed up order on roof pitch. I ordered a 2:12 pitch, the salesmen messed up and ordered a 1:12. I didn't find out until building was on truck and on its way to me. Only one day trip to me. I ended up keeping it. Price was adjusted on deal, so they didn't eat the building. I had worked for them in the past, so we made it work. I figured it was engineered for our snow loads. Still really bothered me, so if I get a real big snow, we just turn heat on. Knock on wood, the snow comes off it.
I hired a friend to help build it, he used my sons to help him put it together. Neighbor I hired to do my concrete; his wife ran the batch plant for concrete company. He hired a form setter to come in and walls and footings, neighbor did flat work. We really kind of wanted a Nucor building. However, at the time they priced quite a bit higher. They were 70 miles from me. https://www.nucorbuildingsystems.com/
(shop (full).jpg)
Attachments ---------------- shop (full).jpg (139KB - 1 downloads)
| |
|