|
| Looking at building our first bins. I already own the ground, it’s not cropped and basically dormant anyways. Would be nice to save on the drying bill, no shrink, harvest time, and be able to take advantages of the carry. Found a used 36’ bin and continuous flow dryer. What would be a ball park idea for concrete for the bin, 10’x20’ dryer pad, and a 20’ pad for wet bin, electrical, and probably need some augers/double runs to and from bins. Have electricity at the shed and well 200’ away from potential site | |
|