NE Nebraska | 36x14 gsi put up a couple years ago. Plenty of rebar in pad. Pad 2’ outside of bin wall, 2’ below grade, 2’ above grade footing with 8” center pad. All poured in one slab. My only complaint was I thought the concrete was plenty loose to pour. So far so good.