|
| I currently have 5 acre field the slope is .050 , I need to increase the slope, it takes 12 hours to flood irrigate. If I were to move it to .10 how many yards of dirt would I need to pull? My scrapper pulls 4 yards. Or would I be getting myself into a big job ?
Edited by Lawrence505 9/3/2024 08:12
(IMG_9285 (full).png)
Attachments ----------------
IMG_9285 (full).png (253KB - 53 downloads)
| |
|