Posted 8/29/2024 18:35 (#10871402 - in reply to #10870626) Subject: RE: Tips for In bin drying winter Rye?
Western NY
I call my Sukup dealer and they calculate drying times with a computer program.. For example, I just had 3500 bu of wheat to dry down 1 point in a 24 ft stirring bin with a 5-7 hp 24 inch axial fan. He said 4-6 hrs @ 120F. I would think 8-10 hrs tops for 5000 bu.