Posted 8/22/2024 17:34 (#10861927 - in reply to #10861480) Subject: RE: Department of Energy 5-20 mile wide corridors
Illinois
Regional transmission operator such as MISO study the base loads and the needs of the grid . This is why they have an interwoven planning commission. This HVDC line is not needed so says this operator and long term planning commission.