Posted 7/8/2024 00:16 (#10802379 - in reply to #10797372) Subject: RE: Combine Access and Utility Poles
nw pa
After talking local REA engineer it see that most don’t want hassle They just string the lines without checking with REA. Who will then install taller post at the expense of fiber optic.
They are just blowing smoke unti they properline clearance through REA engineering dept don fall for it