|
| My experience is get enough rock to get a foot or so above the surrounding area. Then get the middle high enough the water runs off.
I put down a a grain hopper of clean gravel in an area the size of the trailer. Slope to lower edge.
A load of road rock on top to seal.
Or just 1 1/2 a clean on top and in a year or 2 makes its own fines.
We have lime stone here so gravel may be different there. We can get some other material but the edges are smooth.
If you break through the gravel and make tracks you need to start over. | |
|