|
SW Ohio | If you're trying to do it with one machine then loader hands-down. Those 963B were some good loaders, with lots of power, believe they got a 6 cylinder engine over the original 963 only having a 4 cylinder.
However, since you already own the excavator, I would lean towards the dozer. Much better machine for grading once the trees are out of the way, and you can push piles away from the excavator easily | |
|