|
NW Iowa | Just make sure you have 3 phase.
This site holds 150K bu.
Loads out 98bu a min.
Only you will know what you need.
Put it someplace central located with easy access.
Edit- $1200 electric bill will load, dry and unload this site
Only you know how fast and how much you are storing.
Make sure you have at least a 30K bu wet bin.
7000 acres, you will want a leg and a pit.
Edited by Massey1155 2/17/2024 09:28
(KIMG0680 (full).JPG)
(KIMG0681 (full).JPG)
(KIMG0846 (full).JPG)
(015 (full).jpg)
(016 (full).jpg)
(KIMG0683 (full).JPG)
Attachments ---------------- KIMG0680 (full).JPG (158KB - 38 downloads) KIMG0681 (full).JPG (159KB - 37 downloads) KIMG0846 (full).JPG (128KB - 39 downloads) 015 (full).jpg (68KB - 40 downloads) 016 (full).jpg (82KB - 37 downloads) KIMG0683 (full).JPG (111KB - 39 downloads)
| |
|