AgTalk Home
AgTalk Home
Search Forums | Classifieds (129) | Skins | Language
You are logged in as a guest. ( logon | register )

Removing concrete scale for grain dump pit?
View previous thread :: View next thread
   Forums List -> Machinery TalkMessage format
 
Mike_N
Posted 11/22/2023 12:12 (#10492341 - in reply to #10492109)
Subject: RE: Removing concrete scale for grain dump pit?


Michigan
Here's another twist on the double u-trough idea that I've been tossing around to run two trucks with one driver:

Park truck #1 over the double u-trough, open the traps and start dumping. U-trough and leg have some automation that will stop everything when the truck is empty. Might want some safety features that shut everything down for other reasons too if needed.

Driver then hops in truck #2 and heads off to the field for a load. When he comes back, he'd have to hop out of truck #2, pull truck #1 ahead, position truck #2 and start the dumping process, and hop into truck #1 and head to the field. So your truck driver would be getting a bit of exercise and losing some time positioning trucks--that's probably the biggest drawback I see. On the other hand the capital cost is going to be vastly lower than a double pit and reworking your scale.

Note that this is just in the idea phase right now, I have not actually tried to do any of this in the real world yet.

-Mike
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)