Posted 11/22/2023 11:33 (#10492309 - in reply to #10492055) Subject: RE: Removing concrete scale for grain dump pit?
East Central Ia
Moving the leg would cause us to have redo a bunch of overhead things. The reason for the higher capacity leg is to help future proof things, the reason for a taller leg is to give us more room to replace our small 30’ wet bin in the near future. If we move it we would have to go a lot higher, and a lot longer and larger diameter down spouts.