Northwest IOWA | We are forming up a 45.5 ft pad to set a 42.6ft Dia Behlen on it .the bin was built here in 1986, and the foundation is settling bad , also the 8in drag reclaim is cemented in , and shot, and aeration floor is an 18 X 18 ft Sq in the center,We dump hot now, so after we swing the bin on the new concrete , it will get a Springland U trough re claim , And a Brock Tri core floor.The bin will sit close enough to the tower to spout dry corn straight into...at the location now, we spout to a small bin, and an 8 inch roof auger fills it... that is also getting tired and needs to go away. | |
|