|
Britton, SD | How do I get 30' centers done for that, did two projects this yr and both over double that one was almost 2500(socked tile and lift station with buried electric, not a full quarter either) the other one was daylighted and not even all tiled left a creek channel that's 13 acres down the middle. I would get a current quote and use that or a perentage of it based on how one it is and useful life remaining, did that on irrigation system yrs ago. | |
|