|
NW IA | Here is a link to the previous threads:
https://newagtalk.com/forums/thread-view.asp?tid=1127639&posts=2#M10...
This past 2 weeks got some of the last trim work complete and got the remainder of the drip ledge for the steel placed. Forming and pouring the floor in approx 30' sections at a time. Rebar supported at 2" from the foamboard. Forms have built in "tongue and groove" notch to link the individual pours together. Rebar drilled and connected to the stem wall of the building. Using pea rock leveled by a laser bucket prior to laying insulation and rebar. Final floor thickness is running around 7.5". Next weeks will be pouring the floor in the sections that go out the overhead doors, so they have the right slope feature at the exit of the building.
We've started on soybeans last week, around 100 acres so far, approx 55 bu/ac which is pretty much APH. Ran out of ready beans so took the weekend off, back at it tomorrow. Have a safe harvest everyone!
(IMG_20230906_173251434 (full).jpg)
(IMG_20230906_173317893 (full).jpg)
(IMG_20230906_173628991_HDR (full).jpg)
(IMG_20230906_174150474 (full).jpg)
(IMG_20230906_174731516 (full).jpg)
(IMG_20230916_183323030 (full).jpg)
(IMG_20230916_183501836 (full).jpg)
(IMG_20230916_184015640 (full).jpg)
Attachments ---------------- IMG_20230906_173251434 (full).jpg (88KB - 453 downloads) IMG_20230906_173317893 (full).jpg (79KB - 483 downloads) IMG_20230906_173628991_HDR (full).jpg (65KB - 493 downloads) IMG_20230906_174150474 (full).jpg (78KB - 460 downloads) IMG_20230906_174731516 (full).jpg (59KB - 448 downloads) IMG_20230916_183323030 (full).jpg (38KB - 432 downloads) IMG_20230916_183501836 (full).jpg (62KB - 452 downloads) IMG_20230916_184015640 (full).jpg (82KB - 448 downloads)
| |
|