Posted 9/16/2023 20:23 (#10404236 - in reply to #10404229) Subject: RE: Finally got some troughs fixed
Forgot to add the ADS pipe only goes 2.5 feet down. Thought about using steel pipe and welding a top on a bigger pipe and setting it around the PVC. Then spray foam the void after set. I'm thinking that would offer better freeze protection.