Posted 7/21/2023 06:41 (#10325323 - in reply to #10324368) Subject: RE: Tile start holes
ncia
I always cover the connection an any exposed tile by hand with some of the surrounding soil. Just a couple inches. After that push rest in with backhoe tractor.