Macon, IL | Just got our first big rain since pipeline guys left. Major pond, 1 inlet not flowing at all and water has now overtopped terrace. The grass strips along the ends of field where they sowed grass in late November is now full of 6" gulleys.
Glad I didn't sign the release they were asking for 6 weeks ago.
My guess is they did an ok job repairing the inlet and where they cut the tile but that when they removed the top 18" of soil driving the heavy pipeline equipment around on that old shallow clay tile broke it where they never dug.
I know local tile guys aren't going to want to go near that pipeline with a backhoe. | |
|