AgTalk Home
AgTalk Home
Search Forums | Classifieds (98) | Skins | Language
You are logged in as a guest. ( logon | register )

rainy day projects engineering help needed
View previous thread :: View next thread
   Forums List -> AgTalk CafeMessage format
 
Buster 50
Posted 4/26/2011 20:46 (#1746606)
Subject: rainy day projects engineering help needed



North West IA/western AZ
Had time to put up some pallet racking and then decided to build a mini loft above my chemical inductor to hold the bulk tank so I don't have to spend time pumping it into the inductor. Am I OK with this construction or do I need to do more bracing? I used the laminated columns of the building on the back with a 2x12 between on the inside (supported by 2x6 to the floor). On the outside is a pair of 3x6s with 2x12s bolted on each side. The floor is 2x12s screwed down with deck screws. I am thinking about anchoring the 3x6s to the cement. TIA



(2011-04-26_18-09-49_631.jpg)



(2011-04-26_18-09-23_326.jpg)



(2011-04-26_18-08-55_115.jpg)



(2011-04-26_18-08-39_786.jpg)



Attachments
----------------
Attachments 2011-04-26_18-09-49_631.jpg (54KB - 75 downloads)
Attachments 2011-04-26_18-09-23_326.jpg (51KB - 77 downloads)
Attachments 2011-04-26_18-08-55_115.jpg (45KB - 71 downloads)
Attachments 2011-04-26_18-08-39_786.jpg (41KB - 70 downloads)
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)