Have a 1500 bushel, 12 foot diameter bin on 12 inches of cement that is in the road for the new 7700 bushel hopper on skids going beside it so had to move it about 10 feet, cement and all. Used the 9330 and 1" cable.
Dug around cement so cable could go under the first time and loosen the pad from the ground
Cable ended up grabbing and started to bring pad and bin then went under the cement. So had to reset the cable a few times before it finally got to where I needed it.
Few ruts to repair Final spot and ready for new bin
Edited by glensts 5/30/2010 10:25
|