|
![](/profile/get-photo.asp?memberid=23732&type=profile&rnd=727) Paradise KS | I haven't posted anything since the basement was done and people showed interest it how it was going. Took Morton three weeks to do the exterior and floor system and put installation in with four guys. Was impressed with their work, they changed a couple things at my asking no questions asked. They finished last saturday, now its my turn.
Edited by SpringBrookFarm 11/21/2016 22:32
(IMG_1389.JPG)
(IMG_1389.JPG)
(IMG_1392.JPG)
(IMG_1038.JPG)
(IMG_1397.JPG)
(IMG_1399.JPG)
(IMG_1402.JPG)
(20AC44CE-9E85-4C15-97FE-18E2D7388538.JPG)
(8BB72DEA-CBDA-4FE0-B863-E2E00E3D65DF.JPG)
(IMG_1419.JPG)
(IMG_1420.JPG)
(IMG_1427.JPG)
(IMG_1431.JPG)
(IMG_1441.JPG)
(IMG_1451.JPG)
(IMG_1463.JPG)
Attachments ----------------
IMG_1389.JPG (129KB - 274 downloads)
IMG_1389.JPG (129KB - 284 downloads)
IMG_1392.JPG (149KB - 265 downloads)
IMG_1038.JPG (134KB - 255 downloads)
(0KB - 263 downloads)
IMG_1397.JPG (178KB - 285 downloads)
IMG_1399.JPG (143KB - 271 downloads)
IMG_1402.JPG (167KB - 266 downloads)
20AC44CE-9E85-4C15-97FE-18E2D7388538.JPG (132KB - 264 downloads)
8BB72DEA-CBDA-4FE0-B863-E2E00E3D65DF.JPG (145KB - 262 downloads)
IMG_1419.JPG (85KB - 263 downloads)
IMG_1420.JPG (133KB - 283 downloads)
IMG_1427.JPG (106KB - 273 downloads)
IMG_1431.JPG (96KB - 259 downloads)
IMG_1441.JPG (123KB - 261 downloads)
IMG_1451.JPG (136KB - 239 downloads)
IMG_1463.JPG (149KB - 259 downloads)
| |
|