|
East Central Arkansas | We got some polypipe laid and started a little water on the cotton crop this week. We might be a few days to early getting started but it takes a while to get all this pipe laid and the bugs worked out of everything. When you start missing all the rains you can get behind real fast. Checking the power units over last week and a bear had visited two of them tearing the fuel lines off and also damaging the safety switches.
(100_1203 (Small).JPG)
(100_1204 (Small).JPG)
(100_1205 (Small).JPG)
(100_1206 (Small).JPG)
(100_1207 (Small).JPG)
(100_1208 (Small).JPG)
(100_1209 (Small).JPG)
(100_1210 (Small).JPG)
Attachments ---------------- 100_1203 (Small).JPG (60KB - 217 downloads) 100_1204 (Small).JPG (67KB - 207 downloads) 100_1205 (Small).JPG (67KB - 210 downloads) 100_1206 (Small).JPG (59KB - 216 downloads) 100_1207 (Small).JPG (74KB - 229 downloads) 100_1208 (Small).JPG (60KB - 214 downloads) 100_1209 (Small).JPG (66KB - 196 downloads) 100_1210 (Small).JPG (60KB - 213 downloads)
| |
|