|
SW OH | For much less than that you could build a real bridge. At least we did. I can't remember how much we have in materials, but around $5,000 I think. 4 new beams, 2 reused, treated 4X4s, some nails, bridge clips, a little concrete, paint, and of course free labor. This was 2010 and materials have probably doubled now.
Mitchco
(100_0348 (full).JPG)
(100_0367 (full).JPG)
(100_0393 (full).JPG)
(100_0410 (full).JPG)
(100_0429 (full).JPG)
(100_0432 (full).JPG)
(100_0438 (full).JPG)
(100_0440 (full).JPG)
Attachments ----------------
100_0348 (full).JPG (153KB - 8 downloads)
100_0367 (full).JPG (199KB - 7 downloads)
100_0393 (full).JPG (156KB - 6 downloads)
100_0410 (full).JPG (124KB - 5 downloads)
100_0429 (full).JPG (188KB - 4 downloads)
100_0432 (full).JPG (148KB - 3 downloads)
100_0438 (full).JPG (141KB - 2 downloads)
100_0440 (full).JPG (171KB - 1 downloads)
| |
|