|
 northeastern Ohio | I finished yesterday. I don't remember the last time I finished in September. Usually we start about this time and finish mid October. No real rain for the last 2 months, but still got a decent crop.
Had some major breakdowns this year. Electromagnet clutch had a bearing failure that destroyed itself. Switched to the other chopper and had a hydraulic line crack. Could not find a new ferrule to fit this metric machine, so I had to re-use the old one. Then the drain plug came out of the blower gearbox and lost all the oil in the field. Didn't notice until I smelled smoke. Pinion shaft bearing failed due to lack of oil and had a small fire from the hot shrapnel. Pulled the electromagnetic clutch from that chopper and put it on the first one.
Parts are no longer available from NH, so I will have to do some searching. Found a clutch.... for $12k.... and a blower gearbox for $6k..... cheaper to find a whole machine for parts. Going to keep looking.
(548426812_1178072257465943_4600132507288978144_n (full).jpg)
(20250912_092246 (full).jpg)
(26744699_G (full).jpeg)
Attachments ----------------
548426812_1178072257465943_4600132507288978144_n (full).jpg (170KB - 5 downloads)
20250912_092246 (full).jpg (95KB - 5 downloads)
26744699_G (full).jpeg (73KB - 3 downloads)
| |
|