Posted 2/2/2025 22:32 (#11086304 - in reply to #11086236) Subject: RE: feed bodies
N.C. IA
If your hydraulics can handle the high output unload, it’s a no brainer. Would shave off about 10 minutes on a 24 ton load, albeit comparing an older Walinga regular to a little newer CEI high output unload. Can’t speak to the air gates